HEB Engineers has submitted hydrologic and hydraulic (H&H) studies for six bridges in the Culter River watershed, as well as preliminary design for Tuckerman Ravine Trail Bridge #3
reconstruction to the US Forest Service. The project is part of HEB's term contract
with USFS to repair damage caused by Tropical Storm Irene along the
popular Tuckerman Ravine Trail, as well as study ways to alleviate
future drainage issues in the area.
 |
| Surveying near Hermit Lake Hut |
 |
| Bridge survey (Tucks Bridge #2) |
Labels: USFS WMNF